Five steps from brief to a finished home
We work back from the day you receive the keys, so the home is designed, ordered and in the country before you need it.
Brief
Tell us about the home, the building and when you get the keys. We work back from that date.
Scheme
A board for every room, with every item specified. Two rounds of changes, then sign-off.
Order
On sign-off we place orders with our makers and consolidate everything into one shipment.
Arrival
Everything is received, checked and held in storage in the UAE until the last piece has landed.
Install
Two to five days on site: unpack, assemble, place, hang and style, and remove every trace of packaging.
Working with us from overseas
Most owners are not in the country while the work happens. Boards are signed off by email or video call, and each week you receive a short written update: what has been ordered, what has landed, the install date, and anything that needs your decision.
We coordinate access, lift bookings and delivery windows with the building, and you arrive to a home that is finished.
Timed to handover
If the home is off-plan, tell us the expected handover date and send the floor plans. We design and order ahead, hold everything in storage, and install as soon as you have the keys. Three to six months of lead time is ideal.

Included
- Design, boards and specification
- Procurement directly from the makers
- Freight and storage
- Delivery, assembly, installation and styling
- Removal of all packaging
- A weekly written update and one point of contact
Not included
- Structural changes
- Electrical and plumbing works
- Permits and NOCs
Where these are needed we document the design and work alongside a licensed local fit-out contractor, engaged separately.
Tell us about the home.
Share the floor plan and your handover date. We reply within one working day, and every project is quoted individually.
Enquire